Week Two: A Lot Going on Under The Rocks
April 3 —6
.
As the masons began taking down the southern wall of the subterranean passageway that we fondly call the refrigerator (as it is always cool), they realized that the main cause of problems with this area is that, behind and under the rocks on the surface and side of Harvey Fite’s masterwork, there was a great deal of soil. This soil was slowly eroding, washing down into piles of stone below and causing settling. The soil freezing/expanding in the winter continued to push the side walls out, creating bulges that got over the wet summer of 2021. Much of the stone below the soil was pitched outward toward the wall face and that put further pressure on things.
With any restoration project, choices have to be made. As Brian Post noted, “Do we attempt to exactly mimic the original build, and rebuild faults, or do we try to preserve the forms, feel and shape while improving the structure and durability? This is a complex question and many people weighed in. In this case, the decision was made to preserve the forms that Harvey Fite built, but to improve the way it was constructed for increased strength so many generations can enjoy Opus 40 in the years to come.”
The restoration process begins by removing the unstable wall and backfill. As the wall was stripped out quickly laid backing walls were built to keep the stone and dirt pile behind in place while the wall is rebuilt. As the wall was dismantled, stone suitable for reuse was saved and the soil and rubble was hauled off. Much of the stone was deteriorating, and is being replaced with better quality gathered in the old quarry piles on site at Opus 40.
When rebuilding, best practices for dry stone walls include building the walls thick, with “throughstones” placed frequently. All the stones at the face of the wall are placed so their length goes into the wall as deeply as possible, and all the gaps are tightly packed with smaller broken bits of stone called “hearting”.
If time and funding allow, we hope to add some additional work in the area.
This weeks crew was: Brian Post, Seth Harris, TJ Mora, Sean Kelly and two others.…
..
…