[fusion_builder_container type=”flex” hundred_percent=”no” equal_height_columns=”no” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” background_position=”center center” background_repeat=”no-repeat” fade=”no” background_parallax=”none” parallax_speed=”0.3″ video_aspect_ratio=”16:9″ video_loop=”yes” video_mute=”yes” border_style=”solid”][fusion_builder_row][fusion_builder_column type=”1_1″ layout=”1_1″ background_position=”left top” border_style=”solid” border_position=”all” spacing=”yes” background_repeat=”no-repeat” margin_top=”0px” margin_bottom=”0px” animation_speed=”0.3″ animation_direction=”left” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” center_content=”no” last=”true” hover_type=”none” border_sizes_top=”” border_sizes_bottom=”” border_sizes_left=”” border_sizes_right=”” min_height=”” link=”” background_blend_mode=”overlay” first=”true”][fusion_text][fusion_text]

THINKING FORWARD FITE HOUSE

(Chapter One)

…

…

All of us at Opus 40 are still agog with delight at the ownership of this remarkable property! We have a lot of planning to do but are looking at — first — bring the house to code. That will include:

1. Asbestos Removal — Insulation with friable asbestos on heating ducts requires demolition/ removal by a New York State certified asbestos abatement contractor (12NYCRR Part 56). 

2. HVAC Replacement — The ductwork at Fite House requires full replacement. 

3. Septic System Replacement/New Location — A complete relocation with new tank is required. Opus 40 will coordinate with the NYS Department of Health (DOH) on design and installation. 

4. Rewiring —Correction to code will require replacement of the wiring on the interior of the wall cavities and interior of the box. We also need to completely rewire the electricity alongside the house, grounding wires on poles rather than trees, etc. 

5. Water Intrusion into Home/Foundation Issues — Correction of water intrusion issues requires additional drainage and waterproofing of the foundation and sealing or changing the grade. 

6. Foundation Work —We will need to remove the horizontal shear force, specifically all potential sources of surface water that may contribute to soil saturation near the foundation. 

7. Roof and Deck Replacement — Repair will require demolition and rebuilding of the existing decks, and roof replacement, including repairs to multiple skylights. 

8. Tree Proximity —We will need to work with an arborist to determine the scope of removal, pruning, or maintenance. 

9. Repairs — The house requires a range of small- to mid-level repairs. 

 

…

Planning work will be overseen by Opus 40’s staff and Board of Directors. We are deeply fortunate that our Board President is Alan Wanzenberg —  a noted architect with experience invigorating historical buildings and leading capital campaigns, most recently for the Skowhegan School, where he served as president for five years.

Our planning team also includes Opus 40’s executive director Caroline Crumpacker, who has experience helping to oversee the restoration historic properties at The Public Theater and Millay Arts; our facilities manager Tim Gilmore (a master carpenter and general contractor with preservation experience); several Master Craftsman stonemasons including Brian Post of Standing Stone LLC; and Peter Kelly, landscape architect and Director of the Hudson River Park Trust. 

It will be a long and costly process, but the result will be outstanding. Dream with us and let us know what you think!

…

Support the project HERE.

 

…….

….