
Quarrying on the site where Harvey Fite will later create Opus 40.
Throughout most of the nineteenth century, the areas at the foot of the Catskill Mountains were the site of bluestone cutting and quarrying, supplying the stones which paved the streets and sidewalks of Kingston, Albany and New York City.
Bluestone quarries in the Hudson River Valley were small local enterprises. Workers mined bluestone with little to no mechanical equipment. Running concurrent to the establishment of the Ulster & Delaware Railroad, the bluestone business saw a boom (1870 to 1910). By 1898, at least 10,000 people in Ulster County were making a livelihood off of the bluestone industry.
Quarrying was not easy work. Quarrymen would uncover the uppermost layers of good material and then cut a chasm straight down into the stone to a depth of as much as thirty feet. They would then cut straight forward into the vertical wall which they had formed, lifting off layers of stone beginning at the top, and throwing unusable fragments behind them. As they worked, they created large piles of rubble.

Bluestone quarrying.
When each individual piece was cut from the face, it would be swung by horse-drawn derrick to the top of the rubble pile where stonecutters would shape it and send it away for use.
These cutting areas were large and flat, and the stones from which they were formed were firmly settled in place as they had to accommodate not only the workshop but a large area where horses could walk in a circular path to operate the machinery.
The pieces were removed as flat slabs. The quarrymen would select an even vertical surface and follow back from it to a distance which would give them the desired size of the piece. Along this line they would drill a series of holes an inch and a half in diameter and six inches deep, into which they would insert devices called “plugs and feathers” These were simply two pieces of iron half-round (the feathers), between which a wedge (the plug) was driven. The quarrymen then tapped the wedges slowly into the holes, being sure to keep the pressure even along the entire length of the desired piece lest any inequality in the force cause the block to split. Once the piece had begun to move forward, wedges were inserted from the front into the horizontal crack between it and the next piece down, and the loosened section would then be lifted up.

What is now known as the amphitheater at Opus 40.
The quarries today are the result of these processes. In places the vertical excavation is so deep that one can see as many as fifteen layers of geological strata in an exposed face, and the vertical grooves of the drill holes cover many surfaces. Former quarries are frequent in Saugerties, Woodstock and other parts of Ulster County. The bottoms of these places are now frequently filled with the seeping water that underlies all of this land. Some make for marvelous swimming holes.
The Van Bramer brothers ran a large quarry on the property within which Harvey Fite would create Opus 40. Four men were employed during the year. The quarry bed is eight to nine feet thick, six feet of which are workable stone, and the balance, to quote the company, is “rubbish interbedded with the stone. There is not much variation in the quality of the bed.”
— Parts of the above are adapted from a work by Ralph Mosley. For a wonderful timeline of bluestone quarrying in Ulster County, visit the Friends of Kingston Web site.